fill the form











    Why Migrate to Azure

    Moving on-premises workloads to Azure changes how you pay for, protect, and scale your infrastructure.
    • Retire the hardware refresh cycle: Moving workloads to Azure can reduce large hardware purchases and let capacity change as business needs change.
    • Stay on supported platforms: Eligible legacy Windows Server and SQL Server workloads may qualify for Extended Security Updates when moved to supported Azure VM configurations. Eligibility depends on the version, edition, region, and licensing arrangement.
    • Reuse existing licenses: Azure Hybrid Benefit lets you apply Windows Server and SQL Server licenses with active Software Assurance or qualifying subscriptions, lowering the running cost of migrated VMs and databases.
    • Build In recovery: Azure Backup and Azure Site Recovery can protect migrated servers and replicate them to a second Azure region, reducing reliance on a separate physical recovery site where the design and business requirements allow it.
    • Add capacity in Minutes: New VMs can usually be provisioned in minutes within your subscription quotas, so growth and seasonal peaks do not have to wait on a hardware order.
    Why migrate to Azure

    What We Do

    Migration & TCO assessment icon

    Migration & TCO Assessment

    Before setting a schedule, you need an accurate inventory of what runs today and how it connects. We provide:

    • Agentless discovery of servers, databases, and web apps with the Azure Migrate appliance where supported
    • Dependency mapping to show which systems need to move in the same wave
    • A TCO assessment comparing your current on-premises running costs with estimated Azure spend

    The result is a workload-by-workload plan with estimated costs before you commit to the budget.

    Migration landing zone build icon

    Migration Landing Zone Build

    Workloads need a prepared destination before the first server replicates. We deploy:

    • A landing zone aligned to the Microsoft Cloud Adoption Framework
    • Hub-and-spoke networking with VPN or ExpressRoute back to your sites
    • Identity, backup, and monitoring baselines configured ahead of the first wave

    Your workloads arrive in an environment that is ready to run them.

    Server, VM & VMware migration icon

    Server, VM & VMware Migration

    Stable on-premises servers can often move as a lift and shift (rehost), but the assessment determines the right approach for each workload. We handle:

    • Replication of Hyper-V, VMware, and physical servers with Azure Migrate
    • VMware estates moved to Azure VMware Solution or converted to native Azure VMs, depending on your licensing and timelines
    • A test migration into an isolated network before each production cutover

    Each server is tested in Azure before users are switched over.

    SQL server & database migration

    SQL Server & Database Migration

    Databases get their own plan because a problem there affects every application that depends on them. We cover:

    • Compatibility checks for each SQL Server instance and database
    • Re-platform to Azure SQL Managed Instance or Azure SQL Database (PaaS), or rehost to SQL Server on Azure VMs (IaaS)
    • Online migration with Azure Database Migration Service for SQL Managed Instance and SQL Server on Azure VMs, keeping the target in sync until cutover; Azure SQL Database targets move offline in a planned window

    We check row counts and checksums against the source before the old instance is retired.

    Cutover & post-migration optimization icon

    Cutover & Post-Migration Optimization

    Cutover is where a rehearsed plan matters most. We deliver:

    • A cutover runbook for each wave listing owners, timings, and rollback steps
    • Minimal-downtime cutover: a final sync and switchover, usually scheduled for an evening or weekend window
    • Post-migration optimization in the first 30 days, covering VM sizing, storage tiers, and performance baselines

    Your team signs off each wave against acceptance tests agreed before it starts.

    Who We Work With

    • Professional Services Firms for moving file servers, practice management, and billing databases over weekend cutover windows so billable work continues on Monday.
    • Healthcare Organizations for Migrating clinical and records systems having replication configured for encryption, with documented validation at every step..
    • Manufacturing & Distribution Companies for moving ERP and warehouse databases while plant-floor systems stay connected over VPN or ExpressRoute.
    • Financial Services Firms for migrating SQL Server workloads with audit-ready cutover records and tested rollback plans.
    • Multi-Location Retail Businesses for consolidating branch servers into Azure in waves, one group of locations at a time.
    Who we work with for Azure migration
    Why choose Code Creators for Azure migration consulting

    Why Choose Code Creators

    • Microsoft Solutions Partner – Code Creators holds Microsoft Solutions Partner designations in Infrastructure (Azure), Data & AI (Azure), and Digital & App Innovation (Azure), with 15+ years of Microsoft delivery for 700+ clients.
    • One In-House Team – Every role on your migration is filled from our 100+ person in-house team, and the Azure migration consultant who runs your assessment stays with the project through cutover.
    • Works Alongside Your Team – Your staff own application testing and business sign-off while we run discovery, replication, and cutover. Your team joins each wave review, keeps the runbooks, and has 30 days of post-migration support before handover.

    Your Trusted Azure Migration Partner

    Microsoft Certification Badges of Code Creators

    Let’s Talk

    We have 100% successful track-record of serving Fortune 500 Companies from 45+ Industries! Connect with us to experience the Power of Innovative Development and Designs

    Request a Quote

    Free No-Obligation Quote

    Our Process

    1

    Discovery & Migration Assessment

    Typically, in Weeks 1 to 2, we deploy the Azure Migrate appliance, inventory your servers and databases, and map the dependencies between them. Deliverable: an assessment report with a workload inventory, A recommended 7 Rs approach for each system, and a TCO assessment.

    2

    Landing Zone Build

    Typically, in Weeks 2 to 4, we deploy a Cloud Adoption Framework landing zone covering subscriptions, networking, identity, and backup. Deliverable: a working Azure environment and the landing-zone design document your team can use after handover.

    3

    Wave Plan & Pilot Migration

    Around Week 4 or 5, we group workloads into waves by dependency and migrate two or three low-risk systems as a pilot. Deliverable: a wave schedule, a cutover runbook, and a rehearsed rollback procedure.

    4

    Migration Waves & Cutover

    From about Week 5, each wave usually takes one to two weeks. Servers replicate through Azure Migrate, while supported database migrations use Azure Database Migration Service or an appropriate offline method. We test each workload before cutover. Deliverable: a signed acceptance record for every wave.

    5

    Post-Migration Optimization & Handover

    For 30 days after the final cutover, we tune VM sizing and performance and confirm backups and monitoring are working. Where the old environment is no longer required, we decommission the source servers with your team after approval. Deliverable: as-built documentation and an operations handover session.

    Our Clients

    AmeriCU Code Creators client logo
    bluemercury Code Creators client logo
    CERIDIAN Code Creators client logo
    The University of CHICAGO Code Creators client logo
    City of Hope. Code Creators client logo
    World Health Organization (WHO) Code Creators client logo
    University of WATERLOO Code Creators client logo
    University of TORONTO Code Creators client logo
    TIN ROOF TACOS Code Creators client logo
    Stoller Code Creators client logo
    SIEMENS Code Creators client logo
    SAFEGUARD Medical Code Creators client logo
    RioCan Code Creators client logo
    Ontario Trillium Foundation Code Creators client logo
    McMaster University Code Creators client logo
    Macys Code Creators client logo
    Little City Code Creators client logo
    KINROSS Code Creators client logo
    Gate Code Creators client logo
    FlexNGate Code Creators client logo
    Fastwyre Broadband Code Creators client logo

    FAQs About Azure Migration Consulting

    Azure migration is the process of moving servers, databases, applications, and data from on-premises hardware or another cloud into Microsoft Azure. A typical project has four stages: assess what you run, prepare the Azure environment, move workloads in waves, and validate them afterward. Some systems move unchanged, while others are re-platformed onto managed services such as Azure SQL. Many organizations bring in Azure migration partners for the assessment and cutover stages, where planning mistakes are the most expensive to fix.

    There are two costs to plan for: the migration project and your ongoing Azure spend. Project cost depends on the number of servers and databases, how many applications need changes, and how much data moves. The assessment defines that scope, and we quote the project from it. The TCO assessment covers the second cost, comparing what your on-premises estate costs to run today with estimated monthly Azure spend. Azure Migrate’s discovery and assessment tools have no tool-use charge. Server migration has no tool-use charge for 180 days after replication starts, but storage, network resources, and compute used for test migrations can still incur Azure charges.

    It depends mainly on how many workloads you have and how tightly they are connected. Assessment and landing zone build usually take around four weeks. Migration then runs in waves of one to two weeks each. An estate of a few dozen servers often completes in two to three months, while larger estates or those with complex database dependencies can take several months. We build fixed lease or support deadlines into the wave plan from the start.

    Migration approaches are commonly grouped as the 7 Rs of cloud migration: rehost (lift and shift), relocate, replatform, refactor, repurchase, retire, and retain. Microsoft’s Cloud Adoption Framework uses a similar set with slightly different names. Most projects mix several: stable servers are rehosted, SQL Server databases are often re-platformed to Azure SQL, outdated systems are retired, and a few stay on-premises for licensing or latency reasons. The assessment assigns one approach to each workload.

    The migration service encrypts replication traffic in transit, and Azure Storage encrypts data at rest; the exact controls depend on the service and configuration. For server migrations, source machines usually keep running during replication, and nothing is switched off until you approve the cutover. We compare migrated databases with the source using row counts and checksums, and every wave has a rollback plan. We review and configure access controls and backup policies in the landing zone before the first migration wave.

    No. Migrating in waves lowers risk and is easier for your team to absorb. We group systems by dependency so that applications and the databases they rely on move together, and we start with a small pilot to prove the process. Systems that need to stay on-premises for a while, such as plant-floor equipment or software with licensing limits, can remain where they are and connect to Azure over VPN or ExpressRoute until they are ready to move.

    Many supported Windows and Linux workloads can run on Azure VMs with little or no change, but the assessment checks application dependencies, licensing, and operating-system support first. Harder cases include applications tied to specific hardware, operating systems outside Azure support, and software whose license terms restrict cloud hosting. The migration assessment checks each workload for compatibility and recommends an approach: rehost, re-platform, retain, or retire. Anything that needs extra work is identified before the wave schedule is set, so it is planned for from the start.

    Our Microsoft Azure migration services include a 30-day post-migration period covering performance tuning, VM sizing adjustments, and issue resolution. That period ends with as-built documentation and a handover session for your IT team. After handover, you can run the environment in-house or arrange ongoing support with us under a separate agreement. Sizing and performance issues tend to surface in the first few weeks, which is why the support window is included in every engagement.

    Move to Azure on a Schedule You Control

    If you are deciding which Azure migration company to bring in ahead of a hardware or support deadline, start with a consultation. We will review your current estate and show which workloads would move first, what the migration involves, and what Azure would cost to run.

    Explore Related Services